Caliente.ai

Framing takeoff

Takeoff for framing estimators.

A length trade that gets priced as a count. The run gives you plate and sheathing; the spacing and the openings give you studs and headers.

On the S-series and the A-series plans

What framing takeoff actually counts.

The scopes that come off the sheet, and the units they price in: LF, EA, SF.

ScopeUnitWhy it is slow by hand
Wall runs by typeLFBearing and non-bearing are priced apart and drawn together.
PlatesLFRun times the number of plates, which changes by assembly.
StudsEADerived from run and spacing, plus the extras at every opening and corner.
Headers and postsEASized off the schedule, located off the plan.
SheathingSFFace area, less the openings.
Joists and blockingLF, EAOn the framing plan rather than the floor plan.

In your own words

Ask for it the way you would say it.

Open your sheet in Bluebeam Revu. It checks the scale, does the measuring, and asks before it writes.

    Run the exterior walls on this sheet and give me the LF.

    Count the headers on the framing plan.

    Area of the sheathing on this elevation.

    Read back the wall runs so I can check them against my spacing.

See framing run on a sheet.

Bring the scope you price most often. We will take it off in Bluebeam Revu on the call, with you watching the number.