Caliente.ai

Sitework takeoff

Takeoff for site and civil estimators.

The widest set of scopes on one sheet. Paving, curb, walks and utilities all overlap on the same civil plan, and separating them is most of the work.

On the C-series civil

What sitework takeoff actually counts.

The scopes that come off the sheet, and the units they price in: SF, LF, CY, EA.

ScopeUnitWhy it is slow by hand
Asphalt and concrete pavingSFSections change across the same lot, so the areas are not one trace.
Curb and gutterLFEvery radius and every return adds length the eye skips.
Sidewalks and padsSFOften drawn on top of the paving they interrupt.
Storm and sanitary runsLFMeasured between structures, by size.
Structures and inletsEACounted by type off the symbol, not the label.
Silt fence and site perimeterLFA long, irregular run nobody wants to trace twice.

In your own words

Ask for it the way you would say it.

Open your sheet in Bluebeam Revu. It checks the scale, does the measuring, and asks before it writes.

    Area of the asphalt paving on C-101.

    Give me the LF of curb and gutter around the parking field.

    Count the catch basins on this sheet.

    Trace the limit of disturbance and read the perimeter back to me.

See sitework run on a sheet.

Bring the scope you price most often. We will take it off in Bluebeam Revu on the call, with you watching the number.