Roofing takeoff in Bluebeam Revu
Roofing takeoff on a demo sheet open in Bluebeam Revu: roof area by system, perimeter edge in LF, roof and overflow drains counted. The estimator asks in plain words, approves the result, and the quantities land as native, editable markups.
In this run
Asked: “Take off the roof area by system in SF, the perimeter edge in LF, and count the roof drains.”
- R-1 TPO: 10,284.76 SF
- R-2 mod bit: 1,814.19 SF
- Exterior edge: 484 LF
- Internal high edge: 88 LF
- Roof drains: 6 EA
- Overflow drains: 6 EA
Inside the parapets, net of curbs and hatch.
Let’s get to work
See it on
a real sheet.
Book a demo and see Caliente AI at work in Bluebeam Revu.