Sitework takeoff in Bluebeam Revu

Sitework takeoff on a demo sheet open in Bluebeam Revu: asphalt paving by section, curb and gutter runs, catch basins counted. The estimator asks in plain words, approves the result, and the quantities land as native, editable markups.

See sitework takeoff

In this run

Asked: “Take off the asphalt paving in SF by section, the curb and gutter in LF, and count the catch basins.”

  • Standard asphalt: 17,958.91 SF
  • Heavy-duty asphalt: 7,376.61 SF
  • Curb and gutter: 820.17 LF
  • Catch basins: 5 EA

Asphalt to lip of gutter, net of islands.